First, out came the huge 75 litre calorifier.
And I drained the rusty sludge that filled the system.
The bathroom rad came out. I shall re-use this, maybe in the bedroom.
The existing pipework was 22mm. I am replacing this with 28mm and this posed a bit of a problem since I could no longer use the old pipe runs. Unfortunately, the pipes run behind the shower panel, so this had to come off too. I had hoped to leave the bathroom intact until later but that's not happening.
The new 22 litre calorifier could then be fitted in the cupboard and plumbed in.
Its not all done but the Alde is connected and I can at least wash my hands in hot water.