Wednesday 2 December 2015

Bathroom bling

I took the shower out quite early on in the refitting process.  I had intended to leave it as it was so that I could have a shower while working on the boat but I couldn't get the heating pipes behind the side panel without removing it.

The tray was refurbished and set 75mm lower than it was when I got the boat.  I would have liked to go lower still, but the base plate stiffening beams ate too close together for it to fit between them.  Anyway, I can at least now stand up in the shower.

The walls are clad with 'Red Sparkle' pvc panels.  These are easy to cut and fit and being only 250mm wide are a lot more manageable in a tiny space than 1 meter panels.  Not quite finished and as yet not plumbed in but looking good.







Also, I managed to keep the fire 'in' for over 12 hours, so I must be getting used to it now.